DC5000 COMPRESSOR REPLACEMENT PROCEDURE (R-134A)
IF THE V/U IS PLUGGED OR SHOWS EVIDENCE OF BLACK OIL, ALL THE CONTAMINATED OIL MUST BE REMOVED FROM THE SYSTEM. FLUSH THE PLATES WITH MINERAL SPIRITS AND COMPRESSED AIR OR NITROGEN. MOST OF THE OIL WILL BE IN THE PLATES, SO FLUSH REPEATEDLY UNTIL THE MINERAL SPIRITS EXITING THE PLATES IS CLEAN. FLUSH ALL COPPER TUBING TO REMOVE CONTAMINATED OIL. A SUCTION LINE FILTER MAY NEED TO BE FITTED. CONTACT SEAFROST.
DO NOT ADD OIL TO THIS COMPRESSOR. THE OIL QUANTITY HAS BEEN ADJUSTED TO ACCOUNT FOR A NEW RFD AND NO STANDING OIL IN THE SYSTEM. REMOVE ALL CONTAMINATED OIL BEFORE FITTING THE NEW COMPRESSOR.
THE LOW SIDE PRESSURE SHOULD DROP SLOWLY AS THE UNIT COOLS UNTIL AFTER ABOUT 60 MINUTES, THE 0-5 PSI RANGE. A RAPID DROP INTO A VACUUM INDICATES THAT THE VALVE IS PLUGGED OR FROZEN. SEE ATTACHED PRESSURE CHARTS.
IF THE PRESSURE EXCEEDS 220 PSI THE MANUAL HIGH PRESSURE SWITCH WILL DISCONNECT. DO NOT ALLOW THE SYSTEM TO BE OPERATED IN THIS OVERCHARGED STATE; DOING SO WILL CAUSE EXCESSIVE WEAR ON THE COMPRESSOR.
CONDENSING TEMPERATURE WILL GENERALLY BE 15 DEGREES WARMER THAN THE WATER.
PUMP SIZE AND WATER TEMPERATURE ARE ALL FACTORS IN THE OPERATING PRESSURES OF THIS SYSTEM. PLEASE CALL IF YOU HAVE QUESTIONS OR PROBLEMS.
PLATE TEMPERATURE WILL AFFECT RUN TIMES. IT MAY REQUIRE SEVERAL HOURS TO FREEZE THE PLATES IN A TWO PLATE DC5000 SYSTEM.
CLEANING THE VALVE UNIT (V/U)
WITH THE V/U IN THIS POSITION FILL THIS FITTING WITH CLEAN PAINT THINNER (MINERAL SPIRITS). MAKE AN ADAPTOR FROM RUBBER HOSE TO PRESSURIZE THIS FITTING WITH COMPRESSED AIR. USE LOW AIR PRESSURE (10 PSI). HIGH PRESSURE WILL SHUT THE VALVE.

SLUDGE, DIRT, AND CONTAMINANTS WILL BLOW OUT. COLLECT THE CONTAMINANTS IN A CLEAN CLOTH.
REPEAT THIS PROCESS SEVERAL TIMES UNTIL THE MINERAL SPIRITS COMES OUT CLEAN AND THERE IS AIR FLOW THROUGH THE VALVE. NOTE: THE VALVE IS A RESTRICTIVE DEVICE THAT WILL NOT PASS THE FULL VOLUME OF INPUT AIR.